Project Name:
Kitchen/Shed Construction for the Kindergarten in the community of San Jorge
Geographical Location
The submitted project will be implemented in San Jorge, within the village of San Juan Bosco, located in the Pespire Municipality. This village is found in the northeastern part of the Municipality, 22 kilometers from the city and there is access from the highway throughout the year.
Performance Sectors
-Sector: Social
-Sub-sector: Education
Time Period
After the necessary funds are received, it should take three months to complete the project.
Stages in the Implementation of the Project
- Socialization of the project at the community level
- Budget/ Purchase of materials and contract skilled workers
- Transportation of materials
- Work implementation and supervision
General Description of the Project
The project will be that of the construction of a kitchen/shed 4 meters by 5 meters for the Kindergarten.
The kitchen/shed will be constructed of block and will hold or store food, tools, and so forth, and on the other hand, the kitchen will allow the preparation of foods for the students and will preserve the existing kitchen utensils.
Justification
The construction of this property will convert an area of the property in order to prepare and serve foods to the students, which currently do not have this service. Currently, the foods that are cooked are prepared outside in an outdoor clay stove, which is not recommended and puts the children at risk of contamination. In addition the persons that prepare the food are outside and exposed to the sun during food preparation.
Beneficiaries
With the construction of this kitchen/shed, the 30 children who attend the Kindgarden in San Jorge will directly benefit.
Objectives
General Objective: To develop an appropriate place with the minimal necessary conditions to prepare and consume food for the better improvements of the school.
Specific Objective: To construct a kitchen/shed for the Kindergarten.
Anticipated Impact
The Kindergarten will have a space for food consumption and preparation.
Financing
This project is submitted by The Christian Commission for Development, which will negotiate and implement this project.
Project cost: Lps. 56,117.00 or US$ 2,969.15
Materials cost: Lps. 35,867.00 or US$ 1,897.72
Labor: Lps. 15,000.00 or US$ 793.65
Local Materials: Lps. 5,250.00 or US$ 277.78
The municipality will finance the skilled labor and the local materials. The community could provide the labor.
Materials Description
No. |
Description |
Unit |
Quantity |
Unit Cost |
Total in Lps. |
Total in US$ |
1 |
Cement Blocks |
Each one |
600 |
11.00 |
6,600.00 |
349.21 |
2 |
Grey cement |
Bag |
80 |
115.00 |
9,200.00 |
486.77 |
3 |
3/8 Iron Rods |
Lance |
30 |
80.00 |
2,400.00 |
126.98 |
4 |
1/4 Iron Rods |
Lance |
30 |
30.00 |
900.00 |
47.62 |
5 |
Hitching Wire |
Lbs. |
7 |
12.00 |
84.00 |
4.44 |
6 |
Asbestos Nails of ¼ x 14 |
Each one |
60 |
4.50 |
270.00 |
14.29 |
7 |
Wood Boards of 16x2x4 ft. |
Planks |
7 |
65.00 |
455.00 |
24.07 |
8 |
Wood sheets of 16x8x1 |
Sheet |
8 |
150.00 |
1200.00 |
63.49 |
9 |
River Sand |
Meters |
10 |
200.00 |
2,000.00 |
105.82 |
10 |
River Gravel |
Meters |
5 |
200.00 |
1,000.00 |
52.91 |
11 |
Zinc plates 12x32 |
Sheets |
14 |
147.00 |
2,058.00 |
108.89 |
12 |
Oil-based Paint |
Gallon |
2 |
1,800.00 |
3,600.00 |
190.48 |
13 |
Rock |
Meters |
15 |
150.00 |
2,250.00 |
119.04 |
14 |
Metal Door |
Each one |
2 |
2,000.00 |
4,000.00 |
211.64 |
15 |
Metal Windows |
Each one |
2 |
1,500.00 |
3,000.00 |
158.73 |
16 |
Bricks |
Each one |
350 |
6.00 |
2,100.00 |
111.11 |
17 |
Skilled Labor |
|
|
15,000.00 |
15,000.00 |
793.65 |
TOTAL |
56,117.00 |
2,969.14 |
|
|
|
Comisión
Cristiana de Desarrollo, Colonia Florencia Sur,
Calle Los Pinos, Casa 4022, Telefonos (504)239-9951, (504)239-9952, Fax: (504)239-3189
Sitio Web Diseñado y Desarrollado por Carlos Rodríguez Santamaría, Copyright, Agosto 2006 |