Project Name:
Perimeter fence construction for the Republic of Honduras School in the community of El Rebalse.
Project Location:
The submitted project will be implemented in the community of El Rebalse, located in the San Antonio de Flores municipality.
This community is found on the edge of the highway that extends from Tegucigalpa to the southern zone of the country, 76 kilometers from Tegucigalpa.
The paved edge of the highway, which has good access, is found 10 kilometers ahead of the Urban Municipality.
Performance Sectors
Sector: Social
Sub-sector: Education
Timeline for Implementation
The time period for the project’s implementation is 21 days. Depending upon the funds, this time period has been divided into three stages:
- Stage one: buy and transport materials.
- Stage two: construction work.
- Stage three: Finish construction.
General Description of Project
The project consists of the perimeter fence construction circling around the Luis Landa Kindergarten in the center of the community of Esquimay.
Currently, this school building does not have a fence to provide protection and security to the school’s attending students.
Justification
This school building was built 10 years ago through the financing of Fondo Hondureno de Inversion Social (FHIS). Currently, the fence that protects this educational center is already in poor conditions. When the construction was done, they did not use the necessary materials to allow the work to endure well. They constructed the fence with concrete posts, which were buried in the ground and used a sharp wire point, which one by one are falling because the posts were buried directly into the ground without any reinforcements.
There is not a perimeter fence circling the educational center. This allows intruders to damage the infrastructure of the educational center (draw on/scratch the paint from the walls, cut down the trees, steal materials and equipments).
Furthermore, they cannot reforest the grounds surrounding the school because animals easily enter and destroy the planted trees.
Without a fence, the school is at the risk of adults who can arrive and interrupt the activities of the school grounds.
Beneficiaries
With the reconstruction of this fence, we will benefit a total of 70 students that receive classes at the primary level.
Objectives
General Objective:
- Provide security to the existing infrastructure and the school children through the construction of the perimeter fence.
Specific Objective:
- Construct a perimeter fence of 400 square meters.
Providing a perimeter fence to the building in which the primary school functions, that offers protection and security to the school children in their various activities.
Financing
This project has been submitted to The Christian Commission for Development (CCD) in order to negotiate and implement this project.
The project’s cost: Lps.45,433 or US$2,404
-In materials: Lps.31,533 or US$1,668
-In labor: Lps.8,000 or US$423
-In local materials: Lps.5,900 or US$312
The municipality finances the skilled labor, such as the mason, and the transportation of local materials.
The community provides the local labor.
No. |
Description |
Unit |
Quantity |
Unit Cost |
Total in Lps. |
Total in US$ |
1 |
5´ Mesh Fence |
Roll |
5 |
1,650.00 |
8,250.00 |
436.50 |
2 |
Grey cement |
Bag |
75 |
106.00 |
7,950.00 |
420.63 |
3 |
Cement blocks of 15x20x40 |
Each one |
330 |
10.00 |
3,300.00 |
174.60 |
4 |
Hitching Wire |
Lbs. |
15 |
15.00 |
225.00 |
11.90 |
5 |
2¨ Industrial Tube |
Lance |
20 |
400.00 |
8,000.00 |
423.28 |
6 |
3/8 Iron Rods |
Lance |
40 |
80.00 |
3,200.00 |
169.31 |
7 |
1/4 Iron Rods |
Lance |
25 |
20.00 |
500.00 |
26.46 |
8 |
3¨ Nails |
Lbs. |
5 |
12.00 |
60.00 |
3.37 |
9 |
2 ½¨ Nails |
Lbs. |
4 |
12.00 |
48.00 |
2.54 |
10 |
Rock |
Truck |
6 |
550.00 |
3,000.00 |
158.73 |
11 |
River Sand |
Truck |
3 |
550.00 |
1,650.00 |
87.30 |
12 |
River Gravel |
Truck |
2 |
625.00 |
1,250.00 |
66.14 |
13 |
Skilled Labor |
One |
|
8,000.00 |
8,000.00 |
423.28 |
|
45,433.00 |
2,404.04 |
|
|
|
Comisión
Cristiana de Desarrollo, Colonia Florencia Sur,
Calle Los Pinos, Casa 4022, Telefonos (504)239-9951, (504)239-9952, Fax: (504)239-3189
Sitio Web Diseñado y Desarrollado por Carlos Rodríguez Santamaría, Copyright, Agosto 2006 |